Page 25 - BPW axles with air suspension Series O SL AL
P. 25

Struts / bolted steel air suspension hanger brackets                     4.4.6

                                                              Mounting sequence with bolted air suspen-
                                                              sion hanger brackets:

                                                              1.  Bolt the hanger bracket onto the vehicle
                                                                 frame using M 16 knurled bolts. Tightening
                           2  M 16 knurled bolt, frame /
                              hanger bracket connection          torque 260 Nm (240 - 285 Nm).

                                                              2.  Pre-mount the spring bolt loosely.
                                    Vehicle frame             3.  Pre-mount the bracing plate with at least
                                                                 three M 16 10.9 bolts (top) and an M 18 bolt
                                                                 (bottom). Pre-mount the corresponding nuts.

                                     Top plate                4.  Tighten the M 18 connecting bolt (bracing
                Mounting             hanger bracket
                direction                                        plate-spring bolt) to approx. 50 Nm.

                                                              5.  Tighten the M 24 spring bolt loosely until all
                                                                 components have been brought into contact.

                                                              6.  Set the track.

                                                              7.  Tighten the M 24 spring bolt. Tightening
                                                                 torque 650 Nm (605 - 715 Nm).
                                                                  D Doo  nnoott  uussee  aann  iimmppaacctt  ddrriivveerr!!

                    1  Bracing plate
                                                              8.  Tighten the M 18 connecting bolt (bracing
                                                                 plate-spring bolt). Tightening torque 420 Nm
                      1a  M 24 spring bolt with flange           (390 - 460 Nm)

                                                              9.  9. Tighten the top connecting bolts M 16,
                                                                 10.9 (bracing plate/crossmember) to the max.
                                                                 permitted  tightening torque (not supplied by
                                                                 BPW).




                    1c  M 18 connecting bolt
                       bracing plate / spring bolt
                1d  M 18 nut bracing plate / spring bolt

                                                              R Reemmaarrkkss::

                                                              Tracking is established in the usual way and does
                                                              not require any additional tools.


                                                              Contact surfaces for bolted connection parts:
                                                              O Coat thickness for painting, max. 30 µm,
                                                              O coat thickness for hot-dip galvanising
                                                                max. 100 µm.










           BPW-EA-Luft 1023701e                                                                            25
   20   21   22   23   24   25   26   27   28   29   30