Central axle lift 13.6
For lifting the centre or rear axle or, where there is
limited space available, it is possible to use the
central lift system. The centre lift is fitted on the
chassis centre line. The top fixing is mounted to a
chassis crossmember and the lower fixing is
clamped to the axle beam.
The lifting bag forces must be counteracted by an
adequately dimensioned crossmember.
A Aiirr iinnssttaallllaattiioonn::
I Innssttaallllaattiioonn ooff pprreessssuurree rreetteennttiioonn ffoorr cceennttrraall lliifftt
The air pressure for the lift bag should be set at
the pressure control valve to 6 bar!
Central lift Discharge valve ( from lift axle valve)
with 0.5 bar backflow
Air cylinder centres (GM) 469 mm Set pressure control
valve to 6 bar
Remarks:
The location and installation of the axle lift device is
to be carried out according to BPW technical data
and the installation drawing supplied.
The size of the crossmembers must be selected to
offer the safety margins usual in vehicle construc-
tion.